The Macrosite for News, Analysis and Opinion about the Future of the Internet
Geoff Beckman

Boeing Learns Supply Chain Only as Strong as Weakest Link

Written by Geoff Beckman
2/20/2013 47 comments
no ratings
DISCUSS     Email This
When Boeing announced the 787 luxury jet in January 2003, the company christened it "The Dreamliner." Ten years later, it’s become a nightmare. The litany of problems with the 787 makes an SAP project look like a Swiss watch.

Among them:

  • The 787’s scheduled completion date was August 2007. The first commercial flight didn’t happen until October 2011 -- 50 months late.

  • The first three models completed required so many design alterations and part changes that Boeing finally scrapped them.

  • To improve fuel economy, the 787 was supposed to weigh several tons less than existing models. The redesigned model makes Acrobat Reader look svelte -- the 787 is seven and a half tons heavier than planned.

  • In January 2013, the Federal Aviation Administration grounded the 787 after five different airlines reported problems:
    • A Japan Airlines plane caught fire after the batteries (yes, lithium-ion ones) overheated. JAL also reported a fuel leak.
    • United found faulty wiring in one plane, as well as a fuel leak in a different spot.
    • A 787 for Qatar Airways developed a generator problem during its delivery flight. A plane’s cooling system failed on one Air India plane.
    • All-Nippon Air made an emergency landing when its onboard computer reported battery problems and smoke in the engine compartment.

Grounded in a Nightmare
Boeing's 787 Dreamliner turned out to be a supply chain nightmare, as problems quickly transformed into canceled orders. (Source: Wikipedia)
Boeing's 787 Dreamliner turned out to be a supply chain nightmare, as problems
quickly transformed into canceled orders.
(Source: Wikipedia)

How did Boeing produce the aerospace industry's Jurassic Park? By ignoring every development best-practice in the book.

Too many unknowns: Since Boeing hadn't built a new model since 1993, the company re-engineered every component. The body was reshaped to reduce friction; its metal skin was replaced with a carbon-fiber composite. The high-efficiency engines were prototype designs; the mechanical and hydraulic controls were replaced by software-controlled electronics.

Every new design has bugs, which need to be fixed over time. By making every component of the 787 a new development project, Boeing basically ensured that everything could be expected to go wrong.

Changing methodologies: Boeing had always manufactured 60 percent to 70 percent of its plane parts and done all its own assembly. The company managed every supplier directly and used fixed-price contracts (with penalties for late delivery or failed inspections) to drive quality.

For the 787, Boeing decided to outsource 70 percent of the parts and 90 percent of the labor by using a three-tiered production system developed by Toyota. In this model, suppliers (in tier 3) build parts; partners (in tier 2) assemble them into components; and integrators (in tier 1) build the vehicle sections from the components. All Toyota does is the final assembly.

Boeing believed that adding two inspections by different vendors would improve quality. It thought it could trim the 30 days it previously needed to assemble a plane from nuts and bolts down to three. By working with only 50 Tier 1 vendors (not thousands of suppliers), Boeing planned to cut costs by eliminating middle managers and inspectors.

What Boeing overlooked (or, to be blunt, decided to ignore) is that Toyota implemented its process over time, changing steps or suppliers if problems occurred. Since automakers release new cars every year, their suppliers already know how to build many of the components.

Boeing also disregarded this minor detail: Toyota’s recalls and repair rates skyrocketed under the new process. End result? The sticking accelerator in 2009-11 models that caused fatal accidents.

Oh, and planes pass more stringent tests than cars. Because if Toyota screws up, its users can usually get out and walk.

By quadrupling the layers of management, Boeing built a process that compounded failure. Late shipments with defective pieces got slipshod inspections and hurried assembly.

Inept vendor management: As anyone who outsources learns, clear statements, defined requirements, and tough penalties produce better results. Call center agreements must include call volume, time on hold, abandonment rate, and customer satisfaction. Development projects should specify performance levels (speed, volume, and errors), tests required for passage, and bug count. Instead, Boeing replaced its airtight contracts and penalties with partnership agreements and incentives for on-time delivery.

In the past, suppliers worked with Boeing directly, leaving no middleman to blame. The tiered system let each tier point fingers both below (at defective materials) and above (for demands to meet deadlines, not enforce quality).

To dilute accountability further, the 21 vehicle sections in the 787 are built in nine different countries. Each has its own laws -- and courts inclined to take its side.

At one point, Boeing became so exasperated by a partner's repeated failures that it spent $1 billion to buy the plant, just so it could stop making suggestions and begin issuing orders.

Selective listening: Who could have predicted this could happen? Boeing. At the 2001 annual quality seminar, a Boeing engineer analyzed the impact of outsourcing on the aerospace industry. Looking at seven planes built by different companies dating back to the 60s, he showed that quality failures (which led to rework and delays) dwarfed cost savings. "Subcontractors," he summarized, "made all of the profits... [Manufacturers] absorbed all of the over-runs."

In 2009, with the 787 already two years late, professors at UCLA’s business school did a case study on why the project failed. Their paper cited research dating back to 1993.

Boeing has already taken a $2.5 billion write-down on the 787. But unless the company can perform an exorcism on the plane’s issues, it might be the tip of the iceberg.

In an effort to steal market share from Airbus, Boeing priced the 787 at $120 million, far below market rate. The strategy worked; between 2003 and 2007, Boeing booked 817 orders.

But after four years of changes and redesigns, the 787 now costs $145 million to $200 million. Over the last four years, buyers have canceled more orders than they’ve placed.

With investigations just beginning, there’s no way to know what else will surface or when the 787 will fly again. Air India has already thrown in the towel and put its 787 fleet up for sale. Boeing could correct the flaws and 787 will rise from the flames like the legendary Phoenix. But based on the way the plane was built, the smart money says Boeing and its 787 will continue to make ashes out of themselves.

— Geoff Beckman is a marketing, communications, strategy, and technology consultant based in Cleveland, Ohio.

Related posts:

DISCUSS     Email This
Current display:       newest comments first       display in chronological order
< Previous   Page 5 of 5
geoffbeckman
Rank: Cave Painter
Wednesday February 20, 2013 1:42:19 PM
no ratings

@WaqasAltaf: Thanks for the kind words. I had to rewrite the story twice to add further developments, and new stuff comes up every day.  The 787 is now grounded worldwide, and every country's version of the FAA or NTSB is doing it's own probes. Meanwhile, airlines are losing astonishing amounts of money (Poland's LOT airlines is losing $50,000 a day). Every customer is likely to end up suing.

And here's a fun story: 23,000 Boeing engineers and tech workers are voiting on whether to authorize a strike. The union points out that:

  • Boeing has earned $12.6 billion in profits since 2009.
  • The company has returned cash to shareholders with buybacks and a 15 percent dividend boost in that time period.
  • The CEO's compensation was increased by 20% to $22.96 million.

At the root is a feeling that Boeing has chosen to emphasize cost reductions over quality and sizzle over substance. A lot of the hard feelings date back to 2005, when the engineer who headed Boeing's commercial aviation division was passed over for the CEO's job. Boeing chose the former CEO of 3M instead. 

When the engineer left, feeling that he had no future at Boeing, he was replaced by someone from sales.

Some of you might recognize the name of former Boeing engineer, because he's been in the news often over the past few years. His name is Alan Mulally, and he's the CEO at Ford (the one US automaker that didn't require a bailout).

geoffbeckman
Rank: Cave Painter
Wednesday February 20, 2013 1:10:34 PM
no ratings

You could say (I'm not going to, because I'd spend the next two weeks putting out the flame wars) that what Boeing did was a huge Waterfall project... when what car companies do with their models is closer to Agile (continual iteration).

The amazing thing is reading the stuff published circa 2003, which pretty much says "Hey, no problem-- Boeing's on this."

geoffbeckman
Rank: Cave Painter
Wednesday February 20, 2013 1:05:36 PM
no ratings

The problem is that everyone believes they're better, smarter and stronger than the last generation of bozos who failed. Plus, they have some major new advance in technology, which has completely changed the game and totally invalidated the old rules.

The good news, I guess, is that it gives consultants a continuing stream of work. If people didn't keep making the same mistakes, we might have to go out and work for a living.

 

WaqasAltaf
IQ Crew
Wednesday February 20, 2013 12:18:57 PM
no ratings

@ kq4ym

Though it has missed all the deadlines, engineering imperfections are there and legal suits all around but I would love to experience how the aircraft is from the passengers' perspective once it takes off. If almost every part is redesigned and manufactured after a lot of effort, it must have a good end result from the airline's point of view.

WaqasAltaf
IQ Crew
Wednesday February 20, 2013 12:14:15 PM
no ratings

First of all, really loved the way Boeing's situation is explained in the blog.

I didn't knew 787 was so bad. Actually it is not only the mistakes of Boeing that come in mind while understanding the situation but also we tend to compare them with Airbus's success story which makes the situation look more worst. If Boeing doesn't restore confidence of airline giants back, it will turn into what Nokia today is in the mobile device industry.

kq4ym
IQ Crew
Wednesday February 20, 2013 9:19:29 AM
no ratings

The Boeing project just lead credence to the theory that it's impossible to predict the outcome of anything complex.

Over budget, over weight, missing deadlines. All typical in any construction project as even the man on the street knows is likely.

To predict the costs, and finish time of such a large project would almost seem miraculous should Boeing have actually succeeded.

Michael P. Kassner
Thinkernetter
Wednesday February 20, 2013 8:41:54 AM
no ratings

I find it amazing that everyone knows the axiom, "Remember history or you will repeat it." 

Yet, time and time again that is exactly what happens. I worked for a company that made heat-treating equipment used on the 777, and that plane also had issues that history would have pointed out. 

< Previous   Page 5 of 5
The ThinkerNet does not reflect the views of TechWeb. The ThinkerNet is an informal means of communication to members and visitors of the Internet Evolution site. Individual authors are chosen by Internet Evolution to blog. Neither Internet Evolution nor TechWeb assume responsibility for comments, claims, or opinions made by authors and ThinkerNet bloggers. They are no substitute for your own research and should not be relied upon for trading or any other purpose.
previous posts from Geoff Beckman
Geoff Beckman
Geoff Beckman   3/14/2013   41 comments
In a recent column, Mitch Wagner wrote, "Every business -- except one -- strives to make things easier for users." But as bad as Internet publishers are, banks make them look like concierges. That's why banks are quietly heading down the road to oblivion.
5
of
Second Shooter
Cisco & Linksys: A Problem at the Edge

1|4|13   |   2:15   |   No comments


Cisco's rumored sale of Linksys suggests we may have problem with innovation and profit at the edge of our Internet, and that could be critical to the evolution of many Internet-delivered services.
Beau Brendler
Terrorism Expert Says US Gave Away Stuxnet Tech

4|4|12   |   3:29   |   9 comments


US counterterrorism expert Richard Clarke, who came to prominence with his prescient warnings before the 9/11 attacks, tells Smithsonian Magazine the US was responsible for the Stuxnet supersmart worm that attacked parts of nuclear reactors in Iran – and in the process, has given away one of the world's most sophisticated cyberweapons.
Wisdom of the Big Chair
Big-Data Engineers Command Big Bucks

3|8|13   |   2:30   |   No comments


Big-data has become a big point of emphasis for many businesses. While the technology is available to deploy these applications, the needed personnel often is not. As a result, analytic engineers' salaries have blown past the six-figure mark, and hiring these experts has become a challenge for IT managers.
Mary Maida
How Medtronic Overcomes Social Business Resistance

1|31|13   |   1:23   |   No comments


Showing results is the best way to win over social business doubters, according to Mary Maida, Medtronic lead information solutions manager. Internet Evolution's Mitch Wagner interviewed Maida at the E2 Innovate conference.
Kelli Carlson-Jagersma
Wells Fargo Sales Get Social Business Boost

1|16|13   |   2:30   |   2 comments


Wells Fargo uses social software to replace email chains and help its sales team collaborate more effectively to land deals, according to Kelli Carlson-Jagersma, VP Collaboration Strategy for Wells Fargo. Mitch Wagner spoke with Carlson-Jagersma at the E2Innovate conference
Wisdom of the Big Chair
Price, Not Features, Driving Smartphone Sales

11|29|12   |   2:01   |   7 comments


A survey by JD Powers found that customer interest in product features is lessening as phones evolve. Rather than features, price is driving purchases, and that change could have a dramatic impact on how IT departments secure these devices.
Mary E. Shacklett
Watch Your Business Secrets on Multi-Tenant Clouds

11|26|12   |   1:56   |   1 comment


Multi-tenant clouds assure security for clients, but not necessarily for their ideas. Here's one thing you should discuss with your cloud provider before you sign on.
Mitch Wagner
Confessions of a BYOD Hypocrite

11|8|12   |   2:35   |   No comments


BYOD is a bad idea, yet even a dedicated opponent finds it inescapable.
Mary E. Shacklett
Don’t BYOD to the Internet of Things

9|10|12   |   2:46   |   10 comments


The bring-your-own-device approach isn’t suited to monitoring of enterprise equipment and processes. In these cases, it is up to IT to come forward with gear suited to the task.
Tony Kontzer
What the Apple-Samsung Verdict Means to IT

8|30|12   |   2:13   |   14 comments


The decision could discourage innovators looking to the past, and require companies to build from the ground up, leading to a new generation of stagnation in the IT world.
IETV: the thinkerNet on film
5
of
Kim Davis
Big-Data Can’t Always Sell Wine

5|21|13   |   2:23   |   3 comments


Whole Foods Global Wine Purchaser Doug Bell told me about some of the constraints on using analytics in the US wine market.
Paul J. Fleuranges
Digital Signage Keeps NYC Subway Straphangers on Track

5|6|13   |   3:51   |   No comments


New York's Metropolitan Transit Authority is conducting a pilot test of digital kiosks to guide subway users to where they want to go more efficiently and at lower cost.
Kim Davis
Fast Forward to the Future

4|23|13   |   2:29   |   20 comments


A look back at tech writing in the 90s makes us wonder where enterprise IT will be 20 years from now.
Mitch Wagner
Google Launches Its Most Depressing Service Yet

4|15|13   |   2:59   |   10 comments


Google's new Inactive Account Manager lets you control how Google disposes of your accounts when you die.
Second Shooter
Argument Over Top-Level Domains Is 'Stupid'

4|11|13   |   2:07   |   3 comments


The whole Amazon.reader debate is a double-stupid. It's stupid to think that there's any e-book buyer who doesn't know Amazon's URL, and it was stupider to let ICANN launch the whole free-form TLD initiative to start with.
Kim Davis
Ladies, Your Tablet Awaits

3|21|13   |   2:22   |   37 comments


ePad Femme is the world’s first tablet “made exclusively for women.”
Wisdom of the Big Chair
NFC Moves Into the Mainstream

3|20|13   |   2:16   |   No comments


While NFC's original goal was to enhance mobile commerce applications, it is finding its way into a number of other uses, which is creating both opportunity as well as challenges for IT departments.
Wisdom of the Big Chair
Integrating Security Into Your Cloud Contract

3|19|13   |   3:35   |   No comments


Enterprises would like to move to cloud computing but are hesitant because they are concerned about providers’ ability to secure company data. Here are some tips that help to ensure that if breaches occur, the business is not left holding the bag.
Brian Baron
How Edmunds.com Collects Customer Information

3|18|13   |   1:15   |   No comments


Edmunds separates customers into segments based on the info it collects on its site and from partners, and uses that to push out custom content, said Brian Baron, director of business analytics for Edmunds.com, at Predictive Analytics Innovation Summit.
Brian Baron
How Edmunds.com Uses Analytics to Customize Site

3|14|13   |   0:47   |   No comments


The automotive website uses propensity modeling to target ads and customer registration forms, said Brian Baron, director of business analytics for Edmunds.com, at Predictive Analytics Innovation Summit.
an IBM information resource
sponsored content
big blue blog
Alison Diana
Ushering in a new era of cognitive computing systems, IBM announced today the IBM Watson Engagement Advisor, a technology breakthrough that allows brands to crunch big data in record time to transform the way they engage clients in key functions such as customer service, marketing, and sales.
an IBM information resource
sponsored content
Expert Integrated Systems: Changing the Experience & Economics of IT
In this e-book, we take an in-depth look at these expert integrated systems -- what they are, how they work, and how they have the potential to help CIOs achieve dramatic savings while restoring IT's role as business innovator.

READ THIS eBOOK
your weekly update of news, analysis, and
opinion from Internet Evolution - FREE!

REGISTER HERE
Wanted! Site Moderators
Internet Evolution is looking for a handful of readers to help moderate the message boards on our site – as well as engaging in high-IQ conversation with the industry mavens on our thinkerNet blogosphere. The job comes with various perks, bags of kudos, and GIANT bragging rights. Interested?

Please email: moderators@internetevolution.com
Internet Evolution – not for thickies
Keep Critical Data With a Knowledge Management System
Taimoor Zubair
Fortune 500 companies lose at least
$31.5 billion a year by failing to share knowledge. A Knowledge Management System (KMS) can help companies significantly reduce these costs.

CLICK FOR MORE
M2M: Rise of the Machines? Not Yet
David Weldon
In the 1970 science fiction thriller
Colossus: The Forbin Project, two giant supercomputers from the United States and Soviet Union secretly join forces to take control of the collective nuclear might of the two countries. In the film, the two machines discover each other's existence, communicate back-and-forth, share their collective data, and cut their human creators out of the process. It is the ultimate example of machine-to-machine communications, or M2M.

CLICK FOR MORE
M2M: Rise of the Machines? Not Yet
David Weldon
In the 1970 science fiction thriller
Colossus: The Forbin Project, two giant supercomputers from the United States and Soviet Union secretly join forces to take control of the collective nuclear might of the two countries. In the film, the two machines discover each other's existence, communicate back-and-forth, share their collective data, and cut their human creators out of the process. It is the ultimate example of machine-to-machine communications, or M2M.

CLICK FOR MORE
M2M: Rise of the Machines? Not Yet
David Weldon
In the 1970 science fiction thriller
Colossus: The Forbin Project, two giant supercomputers from the United States and Soviet Union secretly join forces to take control of the collective nuclear might of the two countries. In the film, the two machines discover each other's existence, communicate back-and-forth, share their collective data, and cut their human creators out of the process. It is the ultimate example of machine-to-machine communications, or M2M.

CLICK FOR MORE
M2M: Rise of the Machines? Not Yet
David Weldon
In the 1970 science fiction thriller
Colossus: The Forbin Project, two giant supercomputers from the United States and Soviet Union secretly join forces to take control of the collective nuclear might of the two countries. In the film, the two machines discover each other's existence, communicate back-and-forth, share their collective data, and cut their human creators out of the process. It is the ultimate example of machine-to-machine communications, or M2M.

CLICK FOR MORE
Yahoo Needs to Break Tumblr in Order to Fix It
Joe Stanganelli
As
Mitch Wagner discussed today, Yahoo is acquiring Tumblr. The big Internet debate at the moment is whether Tumblr will be good or bad for Yahoo. Regardless of their stances on the future of Yahoo itself, many claim that Yahoo will somehow ruin Tumblr.

CLICK FOR MORE